#165217: "We need something more to prevent mistakes when laying out tracks"
這是關於哪方面的案件?
發生什麼事? 請從下方選擇
發生什麼事? 請從下方選擇
請檢查是否已有同課題案件
若肯定,請「投票」給這樁案件。最高票的案件將「優先」處理!
| # | Status | Votes | Game | Type | Title | Last update |
|---|
細節描述
-
• 如果可以的話,請轉貼螢幕顯示的錯誤訊息。
This is somewhat related to boardgamearena.com/bug?id=50160 and boardgamearena.com/bug?id=69229
Even with confirmation activated, it is easy to make a mistake when laying out tracks and that will very often be game breaking.
I see multiple ways to improve this here are the ones I prefer:
1) Change how the confirmation works : make the confirmation (when the option is activated) be for the entire turn and have it be in the status bar. ( so that no part of the map is covered by a popup and also because people tend to automatically click confirm on popups )
2) If you lay a track that seems "weird", add an extra confirmation step with a message. 'Weird' would be any of the following:
- a) a track that is not connected to any city or previously placed track (yes, you do that willingly sometimes, but not often)
- b) a track next to a city where one end is dangling and the other is not connected to the city (yes, you do that willingly sometimes but not often)
- c) a track where one end leads to a mountain or outside of the map
- d) a track where on end leads to a tile where there is a track but without the 2 actually connecting
I think the best option is 1 because 2 does not cover every single possible missclick and requires more texts.
Option 1 might be more complex technically, I don't know. As the idea would be to also undo changes of dice (using special card 5 or card 1) double actions (using card 2) etc... and return everything to the state at the start of your turn
Option 1 can be reduced to just canceling the lay of the track / last part of the action.
-
• 請說明你當時想做什麼,你做了什麼,然後發生了什麼事
• 你的瀏覽器是什麼?
Google Chrome v134
-
• 請轉貼未翻譯的英文字句。 建議將此錯誤的螢幕截圖上傳到 Imgur.com 並轉貼連結。
This is somewhat related to boardgamearena.com/bug?id=50160 and boardgamearena.com/bug?id=69229
Even with confirmation activated, it is easy to make a mistake when laying out tracks and that will very often be game breaking.
I see multiple ways to improve this here are the ones I prefer:
1) Change how the confirmation works : make the confirmation (when the option is activated) be for the entire turn and have it be in the status bar. ( so that no part of the map is covered by a popup and also because people tend to automatically click confirm on popups )
2) If you lay a track that seems "weird", add an extra confirmation step with a message. 'Weird' would be any of the following:
- a) a track that is not connected to any city or previously placed track (yes, you do that willingly sometimes, but not often)
- b) a track next to a city where one end is dangling and the other is not connected to the city (yes, you do that willingly sometimes but not often)
- c) a track where one end leads to a mountain or outside of the map
- d) a track where on end leads to a tile where there is a track but without the 2 actually connecting
I think the best option is 1 because 2 does not cover every single possible missclick and requires more texts.
Option 1 might be more complex technically, I don't know. As the idea would be to also undo changes of dice (using special card 5 or card 1) double actions (using card 2) etc... and return everything to the state at the start of your turn
Option 1 can be reduced to just canceling the lay of the track / last part of the action.
-
• 這些文字存在於 翻譯系統 中嗎?若為真,其是否已被翻譯超過 24 小時?
• 你的瀏覽器是什麼?
Google Chrome v134
-
• 請簡明精確地解釋你的建議,以便讓人一目了然。
This is somewhat related to boardgamearena.com/bug?id=50160 and boardgamearena.com/bug?id=69229
Even with confirmation activated, it is easy to make a mistake when laying out tracks and that will very often be game breaking.
I see multiple ways to improve this here are the ones I prefer:
1) Change how the confirmation works : make the confirmation (when the option is activated) be for the entire turn and have it be in the status bar. ( so that no part of the map is covered by a popup and also because people tend to automatically click confirm on popups )
2) If you lay a track that seems "weird", add an extra confirmation step with a message. 'Weird' would be any of the following:
- a) a track that is not connected to any city or previously placed track (yes, you do that willingly sometimes, but not often)
- b) a track next to a city where one end is dangling and the other is not connected to the city (yes, you do that willingly sometimes but not often)
- c) a track where one end leads to a mountain or outside of the map
- d) a track where on end leads to a tile where there is a track but without the 2 actually connecting
I think the best option is 1 because 2 does not cover every single possible missclick and requires more texts.
Option 1 might be more complex technically, I don't know. As the idea would be to also undo changes of dice (using special card 5 or card 1) double actions (using card 2) etc... and return everything to the state at the start of your turn
Option 1 can be reduced to just canceling the lay of the track / last part of the action.
• 你的瀏覽器是什麼?
Google Chrome v134
-
• 當你不能動作時,螢幕上顯示什麼?(螢幕全黑?部份遊戲介面?錯誤訊息?)
This is somewhat related to boardgamearena.com/bug?id=50160 and boardgamearena.com/bug?id=69229
Even with confirmation activated, it is easy to make a mistake when laying out tracks and that will very often be game breaking.
I see multiple ways to improve this here are the ones I prefer:
1) Change how the confirmation works : make the confirmation (when the option is activated) be for the entire turn and have it be in the status bar. ( so that no part of the map is covered by a popup and also because people tend to automatically click confirm on popups )
2) If you lay a track that seems "weird", add an extra confirmation step with a message. 'Weird' would be any of the following:
- a) a track that is not connected to any city or previously placed track (yes, you do that willingly sometimes, but not often)
- b) a track next to a city where one end is dangling and the other is not connected to the city (yes, you do that willingly sometimes but not often)
- c) a track where one end leads to a mountain or outside of the map
- d) a track where on end leads to a tile where there is a track but without the 2 actually connecting
I think the best option is 1 because 2 does not cover every single possible missclick and requires more texts.
Option 1 might be more complex technically, I don't know. As the idea would be to also undo changes of dice (using special card 5 or card 1) double actions (using card 2) etc... and return everything to the state at the start of your turn
Option 1 can be reduced to just canceling the lay of the track / last part of the action.
• 你的瀏覽器是什麼?
Google Chrome v134
-
• 遊戲規則的哪部分在 BGA 版本有所錯漏?
This is somewhat related to boardgamearena.com/bug?id=50160 and boardgamearena.com/bug?id=69229
Even with confirmation activated, it is easy to make a mistake when laying out tracks and that will very often be game breaking.
I see multiple ways to improve this here are the ones I prefer:
1) Change how the confirmation works : make the confirmation (when the option is activated) be for the entire turn and have it be in the status bar. ( so that no part of the map is covered by a popup and also because people tend to automatically click confirm on popups )
2) If you lay a track that seems "weird", add an extra confirmation step with a message. 'Weird' would be any of the following:
- a) a track that is not connected to any city or previously placed track (yes, you do that willingly sometimes, but not often)
- b) a track next to a city where one end is dangling and the other is not connected to the city (yes, you do that willingly sometimes but not often)
- c) a track where one end leads to a mountain or outside of the map
- d) a track where on end leads to a tile where there is a track but without the 2 actually connecting
I think the best option is 1 because 2 does not cover every single possible missclick and requires more texts.
Option 1 might be more complex technically, I don't know. As the idea would be to also undo changes of dice (using special card 5 or card 1) double actions (using card 2) etc... and return everything to the state at the start of your turn
Option 1 can be reduced to just canceling the lay of the track / last part of the action.
-
• 這項違反規則之處可否在遊戲重播中看到?若可以是在哪步?(重播時左上角資訊)
• 你的瀏覽器是什麼?
Google Chrome v134
-
• 你當時想採取哪個遊戲行動?
This is somewhat related to boardgamearena.com/bug?id=50160 and boardgamearena.com/bug?id=69229
Even with confirmation activated, it is easy to make a mistake when laying out tracks and that will very often be game breaking.
I see multiple ways to improve this here are the ones I prefer:
1) Change how the confirmation works : make the confirmation (when the option is activated) be for the entire turn and have it be in the status bar. ( so that no part of the map is covered by a popup and also because people tend to automatically click confirm on popups )
2) If you lay a track that seems "weird", add an extra confirmation step with a message. 'Weird' would be any of the following:
- a) a track that is not connected to any city or previously placed track (yes, you do that willingly sometimes, but not often)
- b) a track next to a city where one end is dangling and the other is not connected to the city (yes, you do that willingly sometimes but not often)
- c) a track where one end leads to a mountain or outside of the map
- d) a track where on end leads to a tile where there is a track but without the 2 actually connecting
I think the best option is 1 because 2 does not cover every single possible missclick and requires more texts.
Option 1 might be more complex technically, I don't know. As the idea would be to also undo changes of dice (using special card 5 or card 1) double actions (using card 2) etc... and return everything to the state at the start of your turn
Option 1 can be reduced to just canceling the lay of the track / last part of the action.
-
• 你想觸發這個遊戲行動時做了什麼?
-
• 當你試著這麼做時發生了什麼(錯誤訊息、遊戲狀態條訊息...)?
• 你的瀏覽器是什麼?
Google Chrome v134
-
• 問題發生在遊戲的哪一步?(目前遊戲指示是什麼)
This is somewhat related to boardgamearena.com/bug?id=50160 and boardgamearena.com/bug?id=69229
Even with confirmation activated, it is easy to make a mistake when laying out tracks and that will very often be game breaking.
I see multiple ways to improve this here are the ones I prefer:
1) Change how the confirmation works : make the confirmation (when the option is activated) be for the entire turn and have it be in the status bar. ( so that no part of the map is covered by a popup and also because people tend to automatically click confirm on popups )
2) If you lay a track that seems "weird", add an extra confirmation step with a message. 'Weird' would be any of the following:
- a) a track that is not connected to any city or previously placed track (yes, you do that willingly sometimes, but not often)
- b) a track next to a city where one end is dangling and the other is not connected to the city (yes, you do that willingly sometimes but not often)
- c) a track where one end leads to a mountain or outside of the map
- d) a track where on end leads to a tile where there is a track but without the 2 actually connecting
I think the best option is 1 because 2 does not cover every single possible missclick and requires more texts.
Option 1 might be more complex technically, I don't know. As the idea would be to also undo changes of dice (using special card 5 or card 1) double actions (using card 2) etc... and return everything to the state at the start of your turn
Option 1 can be reduced to just canceling the lay of the track / last part of the action.
-
• 當你試著進行遊戲動作時發生了什麼(錯誤訊息、遊戲狀態條訊息...)?
• 你的瀏覽器是什麼?
Google Chrome v134
-
• 請描述顯示問題。 建議將此錯誤的螢幕截圖上傳到 Imgur.com 並轉貼連結。
This is somewhat related to boardgamearena.com/bug?id=50160 and boardgamearena.com/bug?id=69229
Even with confirmation activated, it is easy to make a mistake when laying out tracks and that will very often be game breaking.
I see multiple ways to improve this here are the ones I prefer:
1) Change how the confirmation works : make the confirmation (when the option is activated) be for the entire turn and have it be in the status bar. ( so that no part of the map is covered by a popup and also because people tend to automatically click confirm on popups )
2) If you lay a track that seems "weird", add an extra confirmation step with a message. 'Weird' would be any of the following:
- a) a track that is not connected to any city or previously placed track (yes, you do that willingly sometimes, but not often)
- b) a track next to a city where one end is dangling and the other is not connected to the city (yes, you do that willingly sometimes but not often)
- c) a track where one end leads to a mountain or outside of the map
- d) a track where on end leads to a tile where there is a track but without the 2 actually connecting
I think the best option is 1 because 2 does not cover every single possible missclick and requires more texts.
Option 1 might be more complex technically, I don't know. As the idea would be to also undo changes of dice (using special card 5 or card 1) double actions (using card 2) etc... and return everything to the state at the start of your turn
Option 1 can be reduced to just canceling the lay of the track / last part of the action.
• 你的瀏覽器是什麼?
Google Chrome v134
-
• 請轉貼未翻譯的英文字句。 建議將此錯誤的螢幕截圖上傳到 Imgur.com 並轉貼連結。
This is somewhat related to boardgamearena.com/bug?id=50160 and boardgamearena.com/bug?id=69229
Even with confirmation activated, it is easy to make a mistake when laying out tracks and that will very often be game breaking.
I see multiple ways to improve this here are the ones I prefer:
1) Change how the confirmation works : make the confirmation (when the option is activated) be for the entire turn and have it be in the status bar. ( so that no part of the map is covered by a popup and also because people tend to automatically click confirm on popups )
2) If you lay a track that seems "weird", add an extra confirmation step with a message. 'Weird' would be any of the following:
- a) a track that is not connected to any city or previously placed track (yes, you do that willingly sometimes, but not often)
- b) a track next to a city where one end is dangling and the other is not connected to the city (yes, you do that willingly sometimes but not often)
- c) a track where one end leads to a mountain or outside of the map
- d) a track where on end leads to a tile where there is a track but without the 2 actually connecting
I think the best option is 1 because 2 does not cover every single possible missclick and requires more texts.
Option 1 might be more complex technically, I don't know. As the idea would be to also undo changes of dice (using special card 5 or card 1) double actions (using card 2) etc... and return everything to the state at the start of your turn
Option 1 can be reduced to just canceling the lay of the track / last part of the action.
-
• 這些文字存在於 翻譯系統 中嗎?若為真,其是否已被翻譯超過 24 小時?
• 你的瀏覽器是什麼?
Google Chrome v134
-
• 請簡明精確地解釋你的建議,以便讓人一目了然。
This is somewhat related to boardgamearena.com/bug?id=50160 and boardgamearena.com/bug?id=69229
Even with confirmation activated, it is easy to make a mistake when laying out tracks and that will very often be game breaking.
I see multiple ways to improve this here are the ones I prefer:
1) Change how the confirmation works : make the confirmation (when the option is activated) be for the entire turn and have it be in the status bar. ( so that no part of the map is covered by a popup and also because people tend to automatically click confirm on popups )
2) If you lay a track that seems "weird", add an extra confirmation step with a message. 'Weird' would be any of the following:
- a) a track that is not connected to any city or previously placed track (yes, you do that willingly sometimes, but not often)
- b) a track next to a city where one end is dangling and the other is not connected to the city (yes, you do that willingly sometimes but not often)
- c) a track where one end leads to a mountain or outside of the map
- d) a track where on end leads to a tile where there is a track but without the 2 actually connecting
I think the best option is 1 because 2 does not cover every single possible missclick and requires more texts.
Option 1 might be more complex technically, I don't know. As the idea would be to also undo changes of dice (using special card 5 or card 1) double actions (using card 2) etc... and return everything to the state at the start of your turn
Option 1 can be reduced to just canceling the lay of the track / last part of the action.
• 你的瀏覽器是什麼?
Google Chrome v134
案件沿革
為本案件添加內容
- 其他同樣狀況的桌號/步數
- 按 F5 是否解決了這個問題?
- 問題是否發生了好幾次?每次都發生?時好時壞?
- 建議將此錯誤的螢幕截圖上傳到 Imgur.com 並轉貼連結。
